Double Core Loader Robot installation

  • Transfer core loader robot to another line, for double product casting Line.
  • Complete NRJ reconnections and test
  • Casting Line Program modified including second Robot installed

Project Details
  • Client: MONTUPET SA
  • Function: Core assembling before Casting
Productivity Gain
  • Casting Line, with Double Product
  • Conserved line efficiency
  • Operator Shifts reduced